A Multi-Objective Mathematical Programming Model for Project-Scheduling Optimization Considering Customer Satisfaction in Construction Projects

Author:

Zohrehvandi Mehrnoosh1,Zohrehvandi Shakib2ORCID,Khalilzadeh Mohammad3ORCID,Amiri Maghsoud4,Jolai Fariborz5ORCID,Zavadskas Edmundas Kazimieras6ORCID,Antucheviciene Jurgita7ORCID

Affiliation:

1. Department of Industrial Engineering, Science and Research Branch, Islamic Azad University, Tehran 1477893855, Iran

2. New Technologies Department, Center for European Studies, Kharazmi University, Tehran 1571914911, Iran

3. Industrial Engineering Department, Faculty of Engineering and Natural Sciences, Istinye University, Sarıyer, Istanbul 34396, Turkey

4. Department of Industrial Management, Faculty of Management and Accounting, Allameh Tabataba’i University, Tehran 1489684511, Iran

5. School of Industrial Engineering, College of Engineering, University of Tehran, Tehran 1439957131, Iran

6. Institute of Sustainable Construction, Vilnius Gediminas Technical University, Sauletekio al. 11, 10223 Vilnius, Lithuania

7. Department of Construction Management and Real Estate, Vilnius Gediminas Technical University, Sauletekio al. 11, 10223 Vilnius, Lithuania

Abstract

The aim of this study was to develop a multi-objective mathematical programming model for the trade-off of time, cost, and quality in the project-scheduling problem (PSP) by taking priorities and resource constraints as well as activity preemption into account. First, a small-sized problem instance that was a sub-project of an oil and gas construction project was used for te validation of the proposed model and algorithm. Subsequently, considering the sensitivity, complexity, and importance of oil and gas projects, the proposed model was implemented in a large-sized oil and gas construction project. Considering the NP-hardness of this problem, the NSGA-II metaheuristic algorithm was used to deal with the time, cost, and quality trade-off problem. Finally, a sensitivity analysis was implemented on the three main parameters of time, cost, and quality to investigate the effects of changes on the results. The findings show that the proposed model is more sensitive to cost changes, so an increase in project costs leads to a drastic change in the values of other objective functions.

Publisher

MDPI AG

Reference46 articles.

1. A new multi-objective multi-mode model for solving preemptive time–cost–quality trade-off project scheduling problems;Tavana;Expert Syst. Appl.,2014

2. Project management with time, cost, and quality considerations;Babu;Eur. J. Oper. Res.,1996

3. Time, cost, and quality trade-off analysis for highway construction;Kandil;J. Constr. Eng. Manag.,2005

4. Time-cost tradeoff analysis with minimized project financing cost;Alavipour;Autom. Constr.,2019

5. On the discrete time, cost and quality trade-off problem;Tareghian;Appl. Math. Comput.,2006

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3