Managing financial and economic risks associated with high-rise apartment building construction in Sri Lanka

Author:

Perera B.A.K.S.,Samarakkody Aravindi Lavanya,Nandasena Shyamani Ruwanthika

Abstract

Purpose The financial and economic risks associated with high-rise building projects are many. They make project stakeholders to undergo financial difficulties. However, very few past studies have discussed the management of these risks. Thus, the purpose of this paper is to provide a guideline for the effective management of these financial and economic risks associated with high-rise apartment building projects in Sri Lanka. Design/methodology/approach The study adopted the mixed research approach. A literature review and semi-structured interviews were used to identify the financial/economic risk factors of high-rise apartment building projects and their risk response measures. The data obtained were used for a questionnaire survey, and the findings were analysed using the mean score method. They were validated using pattern matching. The risk response measures that were identified were ranked according to their effectiveness. Findings The findings revealed that “financial problems arising from errors in estimating” is the most significant financial and economic risk factor faced by the property developers involved in high-rise apartment building projects, while “poor contract management” is the most significant financial and economic risk factor faced by the contractors of these projects. Originality/value The study recommends a guideline to manage, using effective risk response measures, the financial and economic risk factors that are significant in high-rise apartment building projects.

Publisher

Emerald

Subject

Economics and Econometrics,Finance,Accounting,Business and International Management

Reference80 articles.

1. Major construction risk factors considered by general contractors in Qatar;Journal of Engineering, Design and Technology,2015

2. Aggregation of factors causing cost overruns and time delays in large public construction projects: trends and implications;Engineering, Construction and Architectural Management,2017

3. A construction industry payment and adjudication act: reducing payment-default and increasing dispute resolution efficiency in construction,2005

4. Alvi, M. (2016), “A manual for selecting sampling techniques in research”, available at: https://mpra.ub.uni-muenchen.de/70218/MPRA

5. An empirical study of consumer behaviour in housing market in Colombo;Built-Environment Sri Lanka,2010

Cited by 11 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3