Cost overrun estimation in the construction of high-rise buildings using fuzzy inference model

Author:

Paydar Ali, ,Khademi Fahraji Yaser,Tajaddini Abbas,Sabzi Zahra, , ,

Abstract

Proper cost forecasting is a major parameter in the success of construction projects, and has a significant impact on various phases of a project, including its budget approval phase. Project managers usually look for solutions to reduce costs. It needs to identify the cost-rising factors, and to exclude them from projects. This study principally aimed at forecasting cost increase of high-rise building construction, using a neuro fuzzy inference model. In fact, the model is able to quantify cost overrun, resulted from each influencing factor, based on fuzzy logic. Through a vast literature review, 43 cost-influencing factors were identified, which then were reduced to 13, using the principal component analysis method, and experts’ opinions. The construction cost was then predicted by the inference model created, based on each factor. The results showed that the factor of “lack of commitment of the Ministry of Housing” had the greatest impact, while the factor of “not considering measures to resolve potential disputes” had the least impact on the estimation of cost overrun in high-rise buildings.

Publisher

Pontificia Universidad Catolica de Chile

Subject

General Medicine,Media Technology,General Medicine,General Engineering,General Medicine,General Medicine,General Medicine

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3