Construction projects delay mitigation using integrated balanced scorecard and quality function deployment

Author:

Gunduz Murat,Al-Naimi Nasser H.

Abstract

PurposeDelays occur mostly in the construction process of many projects, which can have a consequent effect on the overall performance of the project in areas such as profitability, efficiency and safety. This study aims to suggest a structure that can be applied to manage construction projects effectively and, thus, to reduce delays. The integrated balanced scorecard (BSC) and quality function deployment (QFD) framework proposed in the present study enabled the identification and ranking of the objectives of the financial perspective and the enablers of construction delay mitigation. This will help construction industry professionals prioritize the enabling factors that influence the financial perspective, thereby helping them focus on the achievement of the most important ones which subsequently results in efficiency. Consequently, more tasks are accomplished with the use of less time and resources as the actions tend to be more narrowly focused on the achievement of the most important factors such as client and contractor-related factors, as opposed to the low-value adding factors.Design/methodology/approachA literature review was conducted to determine the essential factors that would help resolve or reduce delays. A total of 41 mitigation factors (seven financial objectives and 36 enabler objectives) were identified and categorized into four BSC perspectives: financial, client, contractor and project management team, and innovation and learning. Two management tools, the BSC and QFD, were used to develop the system based on the mitigation factors defined.FindingsThe results of this study show that the most significant factors affecting the achievement of the financial objectives of the project are mainly customer-related factors, accompanied by factors related to contractors and project management teams. With the fishbone diagram and cause and effect analysis, the proposed BSC and QFD system provides a long-term approach for all stakeholders to help professionals in the construction industry prioritize and reduce delays more effectively. Moreover, the findings of the present study highlight the utility of the integrated BSC and QFD framework in quantifying the strengths of association of different objectives of the financial perspective and the enablers of construction delay mitigation.Originality/valueThe contribution of this paper to the body of knowledge is the proposed integrated structure for BSC and QFD that can serve as a comprehensive and structural approach to rating the essential enabling delay mitigation factors based on the magnitude of their effects on the financial performance of the project. The proposed framework can be considered a novel tool since this is the first integrated BSC and QFD framework for construction delay mitigation. Finally, the proposed BSC and QFD framework, along with the fishbone diagram and cause and effect analysis, provides a long-term strategy for all stakeholders to mitigate delays. Thus, the proposed integrated BSC and QFD framework can serve as a systematic and structural approach for measuring the strength of influence of the enablers of delay mitigation against the financial perspective.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3