Deploying Bottleneck Management Strategies for Ameliorating Critical Delays in Building Construction Projects: A Case for Developing Country of Iran

Author:

Karimi Hamidreza1,Sarvari Hadi2ORCID,Edwards David J.23ORCID,Chan Daniel W. M.4ORCID,Olawumi Timothy O.5ORCID

Affiliation:

1. Department of Civil Engineering, Isfahan (Khorasgan) Branch, Islamic Azad University, Isfahan 81595-39998, Iran

2. Department of the Built Environment, Millennium Point, City Centre Campus, Birmingham City University, Birmingham B4 7XG, UK

3. Faculty of Engineering and the Built Environment, University of Johannesburg, Johannesburg 2092, South Africa

4. Department of Building and Real Estate, The Hong Kong Polytechnic University, Hung Hom, Kowloon, Hong Kong, China

5. School of Computing, Engineering, and Built Environment, Edinburgh Napier University, Edinburgh EH10 5DT, UK

Abstract

One of the primary concerns and challenges encountered in the construction industry is the emergence of crucial factors instigating project delays throughout the construction project lifecycle (CPL). The critical delay factors (CDFs) are the significant factors that not only cause project delays but also create obstacles and bottlenecks for the projects. Hence, the current study aims to determine CDFs affecting project completions and ameliorates the adverse situation by developing relevant bottleneck management strategies. To achieve this goal, a desktop review of previous research studies was undertaken to identify the CDFs in the CPL. The brainstorming technique was further utilized to filter the identified CDFs and match them to the context of developing countries, using Iran as a case example. Finally, an empirical questionnaire was created that included 22 CDFs divided into three distinct groups. The questionnaire’s validity and reliability were checked and validated before massive distribution to target respondents. Sixty industry experts appraised the identified CDFs in the CPL based on two assessment criteria: the severity of impact and probability of occurrence. The findings revealed that the groups with the most significant level of impact (out of 5 points) are project planning and design (2.29), construction and delivery (1.99), and policymaking and legislation (1.72). Similarly, the groups of project planning and design (2.30), construction and delivery (2.20), and policymaking and legislation (1.5) were ranked from first to third based on the probability of occurrence. According to the survey findings, the project planning and design stage is the most optimal time to mitigate the impact of project delays. Moreover, the study posited some pragmatic recommendations as bottleneck management strategies for ameliorating the identified CDFs for future projects. The study deliverables can serve as an effective tool for project stakeholders and decision makers to diminish the impact on and penetration of CDFs into building construction projects and enhance the delivery path leading to project success.

Publisher

MDPI AG

Reference74 articles.

1. Problems causing delays in major construction projects in Thailand Problems causing delays in major construction projects in Thailand;Toor;Constr. Manag. Econ.,2010

2. Dynamic and Proactive Risk-Based Methodology for Managing Excessive Geometric Variability Issues in Modular Construction Projects Using Bayesian Theory;Enshassi;J. Constr. Eng. Manag.,2020

3. Substantiation and assessment of claims for extensions of time;Kumaraswamy;Int. J. Proj. Manag.,2003

4. Construction delays: A case study in the Brazilian Amazon;Santana;Ambiente Construido,2017

5. Factors affecting delays in rail transportation projects using Analytic Network Process: The case of Iran;Tavassolirizi;Int. J. Constr. Manag.,2022

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3