A Big Data and FMEA-based construction quality risk evaluation model considering project schedule for Shanghai apartment projects

Author:

Ma Guofeng,Wu Ming

Abstract

Purpose The purpose of this paper is to mine information on the construction process of previous projects to develop a construction plan that meets both quality requirements and schedule constraints. Design/methodology/approach This paper uses a failure mode and effect analysis to evaluate the construction quality of 311 apartments in Shanghai. The authors also evaluate construction-scheduling control using the earned value management technique and implement an artificial neural network to correlate the results. The authors then develop a quality risk and schedule correlation model based on Big Data. The model can predict the relationship between the planned schedule and the project quality risk using multiple variables such as the number of layers, the schedule performance index and budget costs. Findings The methodology offers an innovative approach for assessment on the relationship between quality risk and project schedule. The authors have also built a multiple regression analysis model for comparative purposes with the model. The results show that the proposed model can better describe the relationship. The model can provide a quantitative quality risk value that changes with the planned schedule, as well as help project managers to understand the relationship between quality risk and project scheduling more accurately. Research limitations/implications The research approach only focuses on quality risk under the impact of scheduling. Future efforts might focus on developing a model that connects failure models with project schedules and costs in order to improve the effort of quality management. Practical implications The model based on Big Data in this paper is developed using real projects and reflects the relationship between project quality risk and scheduling in real environments. The created application provides support for project managers to develop and adjust quality plans and schedules, thereby reducing deviations in quality and scheduling objectives. Originality/value The authors make full use of historical project data from the perspective of both quality and schedule management, and provide a novel method to intelligently and objectively analyze the relationship between quality risk and scheduling.

Publisher

Emerald

Subject

Strategy and Management,General Business, Management and Accounting

Reference57 articles.

1. Assessment of factors influencing the failure and abandonment of multi-storey building projects in Nigeria;International Journal of Building Pathology and Adaptation,2018

2. Comprehensive risk management using fuzzy FMEA and MCDA techniques in highway construction projects;Journal of Civil Engineering and Management,2017

3. Evaluation of safety risks in construction using fuzzy failure mode and effect analysis (FFMEA);Scientia Iranica,2016

4. Estimated cost at completion: integrating risk into earned value management;Journal of Construction Engineering and Management,2017

5. Controlling project schedule progress, using control charts;Cybernetics and Systems,2016

Cited by 22 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3