Construction Schedule versus Various Constraints and Risks

Author:

Kostrzewa-Demczuk Paulina1ORCID

Affiliation:

1. Department of Building Engineering Technologies and Organization, Faculty of Civil Engineering and Architecture, Kielce University of Technology, al. Tysiąclecia PP 7, 25-314 Kielce, Poland

Abstract

The organization and planning of construction works are difficult issues due to the complexity, numerous limitations, uncertainty and risks associated with them. Construction planning is usually based on deterministic data. However, numerous studies and analyses of real cases show that a different computational approach is needed—one based on probabilistic data. The computational algorithms of the Time Coupling Method make it possible to introduce probabilistic data generated in the Multivariate Method of Statistical Models (MMSM) and via standard deviations. As a result, a new methodology was created, the Probabilistic Time Coupling Method (PTCM), through which it is possible to obtain a very good forecast of the investment implementation time compared to its real time. The paper presents theoretical considerations, computational schemes and validation exercises of this new method—known as the PTCM. The computational results of the PTCM (with a mapping accuracy prediction of 99%) confirm the effectiveness of the method. The computational algorithms of the PTCM enable the creation of a computational application based on a well-known program, e.g., Microsoft Excel, thanks to which the method can be quickly disseminated in the planning environment and widely used.

Funder

Paulina Kostrzewa-Demczuk

Publisher

MDPI AG

Subject

Fluid Flow and Transfer Processes,Computer Science Applications,Process Chemistry and Technology,General Engineering,Instrumentation,General Materials Science

Reference62 articles.

1. An efficient method for scheduling construction projects with resource constraints;Abeyasinghe;Int. J. Proj. Manag.,2001

2. Ameen, M., and Jacob, M. (2007). Complexity in Projects. A Study of Practitioners’ Understanding of Complexity in Relation to Existing Theoretical Models. [Master’s Thesis, Umea School of Business].

3. Evaluating construction project complexity;Brockmann;CIB Joint International Symposium, Proceedings of the Management of Construction: Research to Practice,2012

4. Project complexity indicators and management strategies—A Delphi study;Kermanshachi;Procedia Eng.,2016

5. Urgiles, P., Sebastian, M.A., and Claver, J. (2020). Proposal and Application of a Methodology to Improve the Control and Monitoring of Complex Hydroelectric Power Station Construction Projects. Appl. Sci., 10.

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3