A reconfigurable model for implementation in the closing phase of a wind turbines project construction

Author:

Zohrehvandi ShakibORCID,Vanhoucke Mario,Soltani Roya,Javadi Mehrdad

Abstract

Purpose The purpose of this paper is to introduce a reconfigurable model that is a combination of a schedule model and a queuing system M/M/m/K to reduce the duration of the wind turbine construction project closure phase and reduce the project documentation waiting time in the queue. Design/methodology/approach This research was implemented in a wind farm project. The schedule model deals with reducing the duration of the turbines closure phase by an activity overlapping technique, and the queuing system deals with reducing the turbine documentation waiting time in the queue, as well as reducing the probability of server idleness during the closure phase. Findings After the implementation of the model, the obtained results were compared to those of similar previously conducted projects in terms of duration, and the model was found effective. Research limitations/implications Project closure is an important and mandatory process in all projects. More often than not, this process is faced with problems including prolonged project duration, disputes, lawsuits, and also in projects like the implementation of wind farms, a queue of documents at closing stage may also cause difficulties in project closure phase. Originality/value The contributions of this research are twofold: first, a combination of project management and queuing system is presented, and second, a reconfigurable model is introduced to enhance the performance and productivity of the closure phase of the project through reducing the implementation time and reducing the turbine documentation waiting time in the queue, as well as reducing the probability of server idleness during the closure phase of the wind farm project.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference44 articles.

1. The professionals’ perspective on the causes of project delay in the construction industry;Engineering, Construction and Architectural Management,2017

2. Structuring product development processes;European Journal of Operational Research,2001

3. Near-real-time optimization of overlapping tower crane operations: a model and case study;Journal of Computing in Civil Engineering,2017

4. Managing multi-project environments through constant work-in-process;International Journal of Project Management,2003

5. Mathematical modeling for reconfigurable process planning;CIRP Annals-Manufacturing Technology,2007

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3