Abstract

All projects require a structure to meet project requirements and achieve established goals. This framework is called project management. Therefore, project management plays an important role in national development and economic growth. Project management includes various knowledge areas such as project integration management, project scope management, project schedule management, etc. The article focuses on the resource-constrained project scheduling known as problem so- called the resource-constrained project scheduling problem (RCPSP). The RCPSP is a part of schedule management. The standard RCPSP has two important constraints, resource constraints and precedence relationships of activities during project scheduling. The objective of the problem is to optimize and minimize the project duration, subject to the above constraints. In this paper, we develop a convolutional neural network approach to solve the standard single mode RCPSP. The advantage of this algorithm over conventional methods such as metaheuristics is that it does not need to generate many solutions or populations. In this paper, the serial schedule generation scheme (SSGS) is used to schedule the project activities using an evolved convolutional neural network (CNN) as a tool to select an appropriate priority rule to filter out a candidate activity. The evolved CNN learns according to the eight project parameters, namely network complexity, resource factor, resource strength, average work per activity, etc. The above parameters are the inputs of the network and are recalculated at each step of the project planning. Moreover, the developed network has priority rules which are the outputs of the developed neural network. Therefore, after the learning process, the network can automatically select an appropriate priority rule to filter an activity from the eligible activities. In this way, the algorithm is able to schedule all project activities according to the given project constraints. Finally, the performance of the Convolutional Neural Network (CNN) approach is investigated using standard benchmark problems from PSPLIB in comparison to the MLFNN approach and standard metaheuristics.

Publisher

Growing Science

Subject

General Decision Sciences

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3