Abstract
Cost overrun is a serious issue in the construction industry worldwide, including Pakistan. Cost overrun is a critical and serious issue found in highway projects among all construction projects in Pakistan. Cost overrun occurs when the final cost of the projects exceeds the actual cost of the project. The main objective of this research is to identify the main causes of cost overrun and to determine possible mitigation measures of the identified main causes of cost overrun from contractors of highway/road projects of Pakistan. In this study, a mixed mode (quantitative and qualitative) approach was used. A deep literature review helped to identify the 30 most common causes of cost overrun in the construction industry. In the first stage, a questionnaire was developed, and a survey was carried out among professional and experts who were working with contractors in highway projects. In the second stage, a semi-structured questionnaire was developed, and a survey was carried out to determine the possible mitigation measures of the identified main causes of cost overrun. Collected data for the first stage from experts were inserted in SPSS and were analyzed by using the average index method and the data of the second stage were analyzed by content analysis. It is expected that the findings of this research will be useful and helpful for the construction stakeholders to control and mitigate the major causes of cost overrun.
Publisher
Engineering, Technology & Applied Science Research
Reference40 articles.
1. A. A. Jhatial, S. Sohu, N. K. Bhatti, M. T. Lakhiar, R. Oad, “Effect of steel fibres on the compressive and flexural strength of concrete”, International Journal of Advanced and Applied Sciences, Vol. 5, No. 10, pp. 16–21, 2018
2. Y. Al-Emad, N. Hamid, Structural Relationships Model of Delay Factors in Makkah Construction Industry, Universiti Tun Hussein Onn Malaysia, 2016
3. I. Mahamid, N. Dmaidi, “Risks leading to cost overrun in building construction from consultants’ perspective”, Organization, Technology and Management in Construction: An International Journal, Vol. 5, No. 2, pp. 860–873, 2013
4. D. M. Matin, “Identifying the effective factors for cost overrun and time delay in water construction projects”, Engineering, Technology & Applied Science Research, Vol. 6, No. 4, pp. 1062–1066, 2016
5. S. Sohu, A. H. Abdullah, S. Nagapan, A. A. Jhatial, K. Ullah, I. A. Bhatti, “Significant mitigation measures for critical factors of cost overrun in highway projects of Pakistan”, Engineering, Technology & Applied Science Research, Vol. 8, No. 2, pp. 2270–2274, 2018
Cited by
15 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献