Significant Mitigation Measures for Critical Factors of Cost Overrun in Highway Projects of Pakistan

Author:

Sohu S.,Abdullah A. H.,Nagapan S.,Jhatial A. A.ORCID,Ullah K.,Bhatti I. A.

Abstract

Stakeholders of the construction industry and academia are often facing problems of cost overrun. It has been observed that many constructions of highway projects are not completed at the approved cost due to certain factors. The objective of this research is to identify the cost overrun critical factors involved in highway projects with their significant mitigation measures. In this regard, literature review helped to identify 64 factors of cost overrun. Based on these 64 common factors, a preliminary survey was carried out among 30 selected respondents of highway projects to identify the critical factors of cost overrun and its possible mitigation measures. Results of the preliminary study reported 8 critical factors and 42 possible mitigation measures for the identified factors. Another questionnaire was established on the findings of the preliminary survey and was distributed among 350 stakeholders of highway projects to identify the significant mitigation measures of finding critical factors of cost overrun. In total, 8 significant mitigation measures were identified as causative and critical factors of cost overrun. The findings of this research would be helpful for the construction practitioners who are dealing with cost overrun issues in the highway projects of Pakistan.

Publisher

Engineering, Technology & Applied Science Research

Reference23 articles.

1. N. Ejaz, I. Ali, M. F. Tahir, “Assessment of delays and cost overruns during construction projects in Pakistan”, available at: http://dl.lib.mrt.ac.lk/handle/123/9431, 2013

2. I. Avotos, “Cost-relevance analysis for overrun control”, International Journal of Project Management, Vol. 1, No. 3, pp. 142–148, 1983

3. N. Azhar, R. U. Farooqui, S. M. Ahmed, “Cost overrun factors in construction industry of Pakistan”, First International Conference on Construction In Developing Countries, Advancing and Integrating Construction Education, Research & Practice, Karachi,, Pakistan, pp. 499–508, August 4-5, 2008

4. I. Abdul Rahman, A. H. Memon, A. Azis, A. Asmi, N. H. Abdullah, “Modeling causes of cost overrun in large construction projects with partial least square-SEM approach: contractor's perspective”, Research Journal of Applied Sciences, Engineering and Technology, Vol. 5, No. 6, pp. 1963–1972, 2013

5. A. Alhomidan, “Factors affecting cost overrun in road construction projects in Saudi Arabia”, International Journal of Civil & Environmental Engineering, Vol. 13, No. 03, 2013

Cited by 8 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3