Identification and Prioritization of Risk Factors Impacting Cost Overrun in Indian Road Construction Projects
Author:
Publisher
Springer Nature Singapore
Link
https://link.springer.com/content/pdf/10.1007/978-981-99-9610-0_17
Reference30 articles.
1. Sui Pheng L, Shing Hou L (2019) Construction quality and the economy. https://doi.org/10.1007/978-981-13-5847-0
2. Shi G, Shan J, Ding L, Ye P, Li Y, Jiang N (2019) Urban road network expansion and its driving variables: a case study of Nanjing city. Int J Environ Res Public Health 16(13). https://doi.org/10.3390/IJERPH16132318
3. Melaku Belay S, Tilahun S, Yehualaw M, Matos J, Sousa H, Workneh ET (2021) Analysis of cost overrun and schedule delays of infrastructure projects in low income economies: case studies in Ethiopia. Adv Civ Eng 2021. https://doi.org/10.1155/2021/4991204
4. Kamaruddeen AM, Sung CF, Wahi W (2020) A study on factors causing cost overrun of construction projects in Sarawak, Malaysia. Civ Eng Archit 8(3):191–199. https://doi.org/10.13189/CEA.2020.080301
5. National Highways Authority of India, Ministry of Road Transport & Highways, Government of India. https://nhai.gov.in/#/. Accessed 14 May 2023
1.学者识别学者识别
2.学术分析学术分析
3.人才评估人才评估
"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370
www.globalauthorid.com
TOP
Copyright © 2019-2024 北京同舟云网络信息技术有限公司 京公网安备11010802033243号 京ICP备18003416号-3