1. Abdullah, M. R., Abdul Azis, A. A., and Rahman, I. A. (2011). “Potential effects on large mara construction projects due to construction delay.” International Journal of Integrated Engineering, Vol. 1, No. 2, pp. 53–62.
2. Al-Najjar, J., Kumaraswamy, M., and Enshassi, A. (2009). “Delays and cost overruns in the construction projects in the gaza strip.” Journal of Financial Management of Property and Construction, Vol. 14, No. 2, 126–151, DOI: 10.1108/13664380910977592.
3. Ameh, O. J., Soyingbe, A. A., and Odusami, K. T. (2010). “Significant factors causing cost overruns in telecommunication projects in nigeria.” Journal of Construction in Developing Countries, Vol. 15, No. 2, pp. 49–67.
4. Association of Project Management (APM). (1995). Body of Knowledge (Version 2), APM, Princes Risborough, U.K.
5. Avots, I. (1969). “Why does project management fail?.” California Management Review, Vol. 12, No. 1, pp. 77–82, DOI: 10.2307/41164208.