Investigating the managerial ‘‘nuts and bolts’’ for the construction industry

Author:

Yap Jeffrey Boon HuiORCID,Chow Ian Ni

Abstract

PurposeManagerial shortfalls can considerably undermine the delivery performance of construction projects. This paper appraises the project management essentials (PMEs) for successful construction project delivery.Design/methodology/approachFollowing a detailed literature review, a questionnaire survey was developed encompassing 20 PMEs that were identified. An opinion questionnaire survey was used to facilitate data collection from key construction stakeholders in the Malaysian construction industry. The survey data were subjected to descriptive statistics and exploratory factor analysis.FindingsFindings indicated that the leading PMEs are competency of the project team, competency of project manager, good leadership, effective planning and control and realistic cost and time estimate. Spearman’s rank correlation tests affirmed a good agreement on the ranking of PMEs across stakeholder groups. The present study found that PMEs for construction have a total of four dimensions, namely: scope, communication and competence management; stakeholder commitment and collaborative engagement; construction time–cost planning and control; and environment, health, safety and quality management.Practical implicationsThe findings could potentially contribute to the development of appropriate project management best practices to address managerial shortfalls in Malaysia and other developing countries.Originality/valueThis paper bridges the identified knowledge gap about critical managerial dimensions for successful project management in construction. The present study adds to the existing body of knowledge around this under-explored area in the construction management literature.

Publisher

Emerald

Subject

Management Science and Operations Research,Civil and Structural Engineering

Reference72 articles.

1. The professionals perspective on the causes of project delay in the construction industry;Engineering Construction and Architectural Management,2017

2. Rethinking construction cost overruns: cognition, learning and estimation;Journal of Financial Management of Property and Construction,2014

3. Empirical study of project managers leadership competence and project performance;Engineering Management Journal,2017

4. Construction delays and their causative factors in Nigeria;Journal of Construction Engineering and Management,2006

5. Importance and ranking evaluation of delay factors for development construction projects in Benin;KSCE Journal of Civil Engineering,2013

Cited by 8 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3