Author:
Zhou Peng,Guo Jingjing,Sun Jian,Zou Defang
Publisher
Springer Science and Business Media LLC
Subject
Civil and Structural Engineering
Reference25 articles.
1. Cho, J. W., Jeon, S., Yu, S. H., and Chang, S. H. (2010). “Optimum spacing of TBM disc cutters: A numerical simulation using the three-dimensional dynamic fracturing method.” Tunneling & Underground Space Technology, Vol. 25, No. 3, pp. 230–244, DOI:
https://doi.org/10.1016/j.tust.2009.11.007
.
2. Delisio, A. and Zhao, J. (2014). “A new model for TBM performance prediction in blocky rock conditions.” Tunneling and Underground Space Technology, Vol. 43, pp. 440–452, DOI:
https://doi.org/10.1016/j.tust.2014.06.004
.
3. Delisio, A., Zhao, J., and Einstein, H. H. (2013). “Analysis and prediction of TBM performance in blocky rock conditions at the Lötschberg Base Tunnel.” Tunneling and Underground Space Technology, Vol. 33, pp. 131–142, DOI:
https://doi.org/10.1016/j.tust.2012.06.015
.
4. Deng, Z. and Yan, Q. (2017). “Analysis of rock breaking efficiency of TBM disc shaped disc cutter for railway tunnel under different penetration.” Subgrade construction, Vol. 3, pp. 49–54 (in Chinese).
5. Heim, A. (2012). “Equipment for advance probing and for advance treatment of the ground from the TBM.” Geomechanics and Tunnelling, Vol. 5, No. 1, pp. 57–66, DOI:
https://doi.org/10.1002/geot.201290043
.
Cited by
23 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献