1. Barla, G., Pelizza, S., 2000. TBM tunnelling in difficult conditions, GeoEng 2000, International Conference on Geotechnical & Geological Engineering.
2. TBM Tunnelling in Jointed and Faulted Rock;Barton,2000
3. Bruland, A., 1998. Hard Rock Tunnel Boring, Doctoral Dissertation, Norwegian University of Science and Technology, Trondheim.
4. Burger, 2006. Hard Rock Cutterhead Design, North American Tunnelling Conference, Chicago.
5. Burger, W., Dudouit, F., 2009. The Hallandsås dual mode TBM, Rapid Excavation and Tunneling Conference, Las Vegas, pp. 416–437.