1. Ashtiani, B., Jalali, G. R., Aryanezhad, M. B., & Makui, A. (2007, December). A new approach for buffer sizing in critical chain scheduling. In 2007 IEEE International conference on industrial engineering and engineering management (pp. 1037–1041). IEEE.
2. Bendavid, I., & Golany, B. (2011). Predetermined intervals for start times of activities in the stochastic project scheduling problem. Annals of Operations Research, 186(1), 429–442.
3. Bie, L., Cui, N., & Zhang, X. (2012). Buffer sizing approach with dependence assumption between activities in critical chain scheduling. International Journal of Production Research, 50(24), 7343–7356.
4. Caramia, M. (2020). Project management and scheduling. Annals of Operations Research, 285(1–2), 1–8.
5. Chu, C. (2008). Buffer sizing and critical chain project management. Computer integrated manufacturing Systems, 14(5), 1029–1035.