Buffer Sizing in Critical Chain Project Management by Brittle Risk Entropy

Author:

Peng Jun-long,Peng ChaoORCID

Abstract

In order to solve the problems such as project duration delay caused by unreasonable buffer zone setting, a critical chain buffer zone setting method is proposed based on fragility theory. Firstly, we propose that the construction process is brittle and the brittleness of the construction process was analyzed. Secondly, this paper introduces a risk-integrated impact rate to describe the uncertainty of the construction process and establishes a brittle risk entropy function. Then, it presents entropy models and modification models of project buffers and feeding buffers based on the original Root Square Error Method. Finally, an engineering project was selected as an example, and the simulation was carried out using the Monte Carlo simulation software Crystal Ball, and the resulting method was compared with three buffer zone calculation methods. The results show that the method can effectively reduce the construction period and is effective and practical when compared to the other three buffer calculation methods. The results of the study provide a new way of thinking about buffer settings based on existing critical chain project management methods.

Funder

The Natural Science Foundation of Hunan Province, China

Publisher

MDPI AG

Subject

Building and Construction,Civil and Structural Engineering,Architecture

Reference52 articles.

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3