1. Ahuja, R., Magnanti, T., & Orlin, J. (1993). Network flows: theory, algorithms, and applications. Upper Saddle River: Prentice-Hall
2. Altner, D., & Ergun, O. (2011). Rapidly computing robust minimum capacity s-t cuts: a case study in solving a sequence of maximum flow problems. Annals of Operations Research, 184, 3–26.
3. Amaya, J., Espinoza, D., Goycoolea, M., Moreno, E., Prevost, T., & Rubio, E. (2009). A scalable approach to optimal block scheduling. In 35th internat. appl. comput. oper. res. in mineral indust. (APCOM) sympos. proc. (pp. 567–571). Vancouver, Canada: CIM.
4. AMPL (2009). AMPL optimization LLC.
5. Askari-Nasab, H., Awuah-Offei, K., & Eivazy, H. (2010). Large-scale open pit production scheduling using mixed integer linear programming. International Journal of Mining and Mineral Engineering, 2, 185–214.