Publisher
Springer Science and Business Media LLC
Subject
Electrical and Electronic Engineering,Control and Optimization,Mechanical Engineering,Aerospace Engineering,Civil and Structural Engineering,Software
Reference59 articles.
1. Aalian Y, Mousavi A, Bsiri MH (2022) A new mathematical model for the optimization of block aggregation in open pit mines. Mining Technology, pp 1–10
2. Askari-Nasab H, Pourrahimian Y, Ben-Awuah E, Kalantari S (2011) Mixed integer linear programming formulations for open pit production scheduling. J Min Sci 47(3):338–359
3. Bai X, Marcotte D, Gamache M, Gregory D, Lapworth A (2018) Automatic generation of feasible mining pushbacks for open pit strategic planning. J S Afr Inst Min Metall 118(5):515–530
4. Bienstock D, Zuckerberg M (2009) A new LP algorithm for precedence constrained production scheduling. Optimization. Online Accessed 29 Aug 2022. http://www.optimization-online.org/DB_FILE/2009/08/2380.pdf
5. Bienstock D, Zuckerberg M (2010) Solving LP relaxations of large-scale precedence constrained problems. In: IPCO, pp 1–14, https://doi.org/10.1007/978-3-642-13036-6_1
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献