Author:
Askari-Nasab H.,Pourrahimian Y.,Ben-Awuah E.,Kalantari S.
Subject
Geology,Geotechnical Engineering and Engineering Geology
Reference40 articles.
1. Holmström, K., TOMLAB /CPLEX — v11.2, Tomlab Optimization., Pullman, WA, USA, 1989–2009.
2. Ramazan, S. and Dimitrakopoulos, R, Traditional and New MIP Models for Production Scheduling with In-Situ Grade Variability,” Int. J. Surface Mining, Reclamation & Environment, 2004, vol. 18, no. 2.
3. Caccetta, L. and Hill, S.P., An Application of Branch and Cut to Open Pit mine Scheduling, J. Global Optimization, 2003, vol. 27, November.
4. Gershon, M., Heuristic Approaches for Mine Planning and Production Scheduling, Geotechnical and Geological Engineering, 1987, vol. 5, no. 1. 5, No. 1.
5. Runge Limited, XPAC Autoscheduler, Runge Limited, 1996–2009.
Cited by
53 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献