1. Barton N (2000) TBM Tunneling In Jointed and Faulted Rock, vol 173. Balkema, Rotterdam
2. Bilgin N, Kuzu C, Eskikaya S (1997) Cutting performance of rock hammers and road-headers in Istanbul metro drivages. World Tunnel Congress 97:455–460
3. Bruland A (1998) Hard rock tunnel boring. Vol.1–10, Ph.D. thesis, Norwegian university of science and technology (NTNU), Trondheim, Norway
4. Delisio A, Zhao J (2014) A new model for TBM performance prediction in blocky rock conditions. Tunn Undergr Space Technol 43:440–452
5. Gehring K (1995) Prognosis of advance rates and wear for underground mechanized excavations (in German). Felsbau 13(6):439–448