1. Banaszak, Z. A., & Zaremba, M. B. (2006). Project-driven planning and scheduling support for virtual manufacturing. Journal of Intelligent Manufacturing, 17(6), 641–651.
2. Bartusch, M., Möhring, R. H., & Radermacher, F. J. (1988). Scheduling project networks with resource constraints and time windows. Annals of Operations Research, 16(1), 199–240.
3. Berthaut, F., Grèze, L., Pellerin, R., Perrier, N., & Hajji, A. (2011). Optimal resource-constrained project scheduling with overlapping modes. In Proceedings of international conference on industrial engineering and systems management (pp. 299–308). Metz, France: International Institute for Innovation, Industrial Engineering and Entrepreneurship.
4. Berthaut, F., Pellerin, R., Perrier, N., & Hajji, A. (2012). Time-cost trade-offs in resource-constrained project scheduling problems with overlapping modes. International Journal of Project Organisation and Management (to appear).
5. Blazewicz, J., & Lenstra, J. K. (1983). Scheduling subject to resource constraints: Classification and complexity. Discrete Applied Mathematics, 5(1), 11–24.