Author:
Feng Xing,Zhang Jian,Li Runing,Huang Xin
Publisher
Springer Nature Singapore
Reference9 articles.
1. Grèze, L., Pellerin, R., Leclaire, P., et al.: CIGI2011: a heuristic method for resource-constrained project scheduling with activity overlapping. J. Intell. Manuf. 25, 797–811 (2014)
2. Wu, X.G., Qin, W.W., Zhang, L.M., et al.: Project progress management and control based on BIM research. J. Build. Econ. 39(10), 6:59–63 (2018)
3. Aminbakhsh, S., Sonmez, R.: Pareto front particle swarm optimizer for discrete time-cost trade-off problem. J. Comput. Civ. Eng. 31(1), 04016040 (2017)
4. Wu, M.C., Sun, S.H.: A project scheduling and staff assignment model considering learning effect. Int. J. Adv. Manuf. Technol. 28(11–12), 1190–1195 (2006)
5. Hossain, M.A.. Chua, D.K.H.: Overlapping design and construction activities and an optimization approach to minimize rework. Int. J. Proj. Manage. 32(1), 983–994, 04016040 (2016)