1. Arundachawat, P., Roy, R., Al-Ashaab, A., & Shehab, E. (2009). Design rework prediction in concurrent design environment: Current trends and future research directions, CIRP design.
2. Ballard, G. (2000). Positive VS negative iteration in design, In Proceedings of the international group for lean construction 8th annual conference (IGLC-8). Brighton, UK.
3. Bashire, H. A. (2000). Models for estimating design effort. PhD Thesis, Canada: McGill University.
4. Blocher E. J., Chen K. H., Cokins G., Lin T. W. (2005) Cost management a strategic emphasis. McGrawhill, New York, p 61
5. Bogus S. M., Molenaar K. R., Deikmann J. E. (2006) Strategies for overlapping dependent design activities. Journal of Construction Management and Economics 24: 829–837