Author:
Moghayedi Alireza,Windapo Abimbola
Publisher
Springer Science and Business Media LLC
Reference77 articles.
1. Adam A, Josephson P E B, Lindahl G (2017). Aggregation of factors causing cost overruns and time delays in large public construction projects: Trends and implications. Engineering, Construction, and Architectural Management, 24(3): 393–406
2. Ahmadi M, Behzadian K, Ardeshir A, Kapelan Z (2017). Comprehensive risk management using fuzzy FMEA and MCDA techniques in highway construction projects. Journal of Civil Engineering and Management, 23(2): 300–310
3. Anderson S D, Molenaar K R, Schexnayder C J (2007). Guidance for Cost Estimation and Management for Highway Projects During Planning, Programming, and Preconstruction. Transportation Research Board
4. Antunes R, Gonzalez V (2015). A production model for construction: A theoretical framework. Buildings, 5(1): 209–228
5. Asgari M S, Abbasi A, Alimohamadlou M (2016). Comparison of ANFIS and FAHP-FGP methods for supplier selection. Kybernetes, 45(3): 474–489
Cited by
11 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献