1. (1) Tomeoka, Shikata, Kabe, Ubugata, Nakata, Sato, Shimokawa, and Okamoto, The Effect of Air Spring System on Wheel Load Variations, Proceeding of TRANSLOG 2001, pp.169-172, No.2211, 2001
2. (2) Tomeoka, Kabe, Tomioka, Kurihara, Sato, Nakai, Shimokawa, The Effect of Air Spring System on Wheel Load Variations, Proceeding of TRANSLOG 2003, pp.95-98, No.1205, 2003
3. (3) Kurihara, The latest truck developments for the Eidan subway, Rolling Stock and Technology, No.80, pp.16-22, 2003
4. (4) Ogino, Shimomura, Nakai, Sato, and Shimokawa, The Newest Designed Bogie Truck with Bolster at Tokyo Metro, Proceeding of J-Rail 2009, pp.179-182, 2009
5. (5) Tomeoka, Kabe, Nomura, Suda, Komine, Nakai, Tanimoto, and Kishimoto, A Method to Realize The Friction Control between Wheel and Rail in Service Lile, Proceeding of J-Rail 2001, pp.535-538, 2001