1. Entacher M. and Galler R., Development of a disc cutter force and face monitoring system for mechanized tunnelling / Ortsbrustmonitoring und Leistungsprognose bei TBM‐Vortrieben, Geomechanics & Tunnelling, Vol.6, No.6 (2013), pp.725-731.
2. Hasanpour, R., Jürgen, S., Ozcelik, Y., Rostami, J., Examining the effect of adverse geological conditions on jamming of a single shielded TBM in Uluabat tunnel using numerical modeling, Journal of Rock Mechanics and Geotechnical Engineering, Vol.9, No.6 (2017), pp.1112-1122.
3. Hassanpour, J., Rostami, J., Zhao, J., Azali, S.T., TBM performance and disc cutter wear prediction based on ten years experience of TBM tunnelling in Iran, Geomechanics and Tunnelling, Vol.8, No.3 (2015), pp. 239-247.
4. Heuser, M., Spagnoli, G., Leroy, P., Klitzsch, N., Stanjek, H., Electro-osmotic flow in clays and its potential for reducing clogging in mechanical tunnel driving, Bulletin of Engineering Geology & the Environment, Vol.71, No.4 (2012), pp.721-733.
5. Huang, X., Liu, Q.S., Liu, H., Zhang, P.L., Pan, S.L., Zhang, X.P., Fang, J.N., Development and in-situ application of a real-time monitoring system for the interaction between TBM and surrounding rock, Tunnelling and Underground Space Technology, Vol.81 (2018), pp. 187-208.