1. Agnetis, A., Mirchandani, P.B., Pacciarelli, D. and Pacifici, A., Scheduling problems with two competing agents, Operations Research, Vol.52, No.2, (2004), pp.229-242.
2. Baker, K.R. and Smith, J.C., A multiple-criterion model for machine scheduling, Journal of Scheduling, Vol.6, No.1, (2003), pp.7-16.
3. Cheng, T.C.E., Ng, C.T. and Yuan, J.J., Multi-agent scheduling on a single machine to minimize total weighted number of tardy jobs, Theoretical Computer Science, Vol.362, No.1, (2006), pp.273-281.
4. Cheng, T.C.E., Ng, C.T. and Yuan, J.J., Multi-agent scheduling on a single machine with max-form criteria, European Journal of Operational Research, Vol.188, No.2, (2008), pp.603-609.
5. Choi, S.W. and Kim, Y.D., Minimizing makespan on a two-machine re-entrant flowshop, Journal of the Operational Research Society, Vol.58, No.7, (2007), pp.972-981.