Abstract
This study considers a scheduling problem for a flow shop with urgent jobs and limited waiting times. The urgent jobs and limited waiting times are major considerations for scheduling in semiconductor manufacturing systems. The objective function is to minimize a weighted sum of total tardiness of urgent jobs and the makespan of normal jobs. This problem is formulated in mixed integer programming (MIP). By using a commercial optimization solver, the MIP can be used to find an optimal solution. However, because this problem is proved to be NP-hard, solving to optimality requires a significantly long computation time for a practical size problem. Therefore, this study adopts metaheuristic algorithms to obtain a good solution quickly. To complete this, two metaheuristic algorithms (an iterated greedy algorithm and a simulated annealing algorithm) are proposed, and a series of computational experiments were performed to examine the effectiveness and efficiency of the proposed algorithms.
Funder
Kangwon National University
National Research Foundation of Korea
Subject
Computational Mathematics,Computational Theory and Mathematics,Numerical Analysis,Theoretical Computer Science
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献