1. Bard, J. F, Dar, E. and Shtub, A., An analytic framework for sequencing mixed model assembly lines, International Journal of Production Research, Vol.30, No.1 (1992), pp.35–48.
2. Bautista, J. and Cano, J., Minimizing work overload in mixed-model assembly lines, International Journal of Production Economics, Vol.112, No. 1 (2008), pp.177–191.
3. Bautista, J. and Cano, A., Solving mixed model sequencing problem in assembly lines with serial workstations with work overload minimization and interruption rules, European Journal of Operational Research, Vol.210, No.3 (2011), pp.495–513.
4. Bautista, J. and Pereira, J., A dynamic programming based heuristic for the assembly line balancing problem, European Journal of Operational Research, Vol.194, No. 3 (2009), pp.787–794.
5. Boysen, N., Fliedner, M. and Scholl, A., Sequencing mixed model assembly lines: Survey, classification and model critique, European Journal of Operational Research, Vol.192, No. 2 (2009), pp.349–373.