Author:
Çimen Tolga,Baykasoğlu Adil,Demirkol Akyol Sebnem
Abstract
Purpose
Various approaches and algorithms have been proposed since the 1950s to solve the assembly line (AL) balancing problem. These methods have established an AL configuration from the beginning. However, a prebalanced AL may have to be rebalanced in real life for many reasons, such as changes in the cycle time, production demand, product features or task operation times. This problem has increasingly attracted the interest of scientists in recent years. This study aims to offer a detailed review of the assembly line rebalancing problems (ALRBPs) to provide a better insight into the theoretical and practical applications of ALRBPs.
Design/methodology/approach
A structured database search was conducted, and 41 ALRBP papers published between 2005 and 2022 were classified based on the problem structure, objective functions, problem constraints, reasons for rebalancing, solution approaches and type of data used for solution evaluation. Finally, future research directions were identified and recommended.
Findings
Single model, straight lines with deterministic task times were the most studied type of the ALRBPs. Eighteen percent of the studies solved worker assignment problems together with ALRBP. Product demand and cycle time changes were the leading causes of the rebalancing need. Furthermore, seven future research opportunities were suggested.
Originality/value
Although there are many review studies on AL balancing problems, to the best of the authors’ knowledge, there have been no attempts to review the studies on ALRBPs.
Subject
Industrial and Manufacturing Engineering,Control and Systems Engineering
Reference60 articles.
1. An approach to find task sequence for re‐balancing of assembly lines;Assembly Automation,2010
2. Reconfiguration of assembly lines under the influence of high product variety in the automotive industry – a decision support system;International Journal of Production Research,2010
3. Iterated local search for dynamic assembly line rebalancing problem;IFAC-PapersOnLine,2016
4. Dynamic rebalancing of an assembly line with a reachability analysis of communicating automata;International Conference on Advances in Production Management Systems,2014
5. Balancing two-sided assembly lines: a case study;International Journal of Production Research,1993
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献