Incident Case Study of Baseline Pigging During In-Line Inspections for Corrosion Resistant Alloy Clad Pipelines

Author:

Reda Ahmed1,Shahin Mohamed A.2,Sultan Ibrahim A.3,Lagat Christopher4,McKee Kristoffer K.2

Affiliation:

1. QatarEnergy, P.O. Box 3212, Doha, Qatar; School of Civil and Mechanical Engineering, Curtin University, Perth, WA 6102, Australia

2. School of Civil and Mechanical Engineering, Curtin University, Perth, WA 6102, Australia

3. Institute for Innovation, Sciences and Sustainability, Federation University, Ballarat, VIC 3350, Australia

4. School of Mines: Minerals, Energy and Chemical Engineering, Curtin University, Perth, WA 6102, Australia

Abstract

Abstract This paper describes an incident that occurred during the baseline inspections of pre-commissioning activities performed on a 20-in. metallurgically bonded corrosion resistant alloy (CRA) clad pipeline of an approximate length equal to 2.7 km. The inspection tool, deployed as part of the baseline inspections before the startup of the pipeline, was damaged in the CRA clad pipeline. This damage occurred despite extensive computer simulations, carried out before the inspection, which indicated that the tool, an ultrasonic (UT) pig, was able to traverse the length of the pipe without major issues. The application of the pressure surges was successful in dislodging the UT pig; however, as a direct consequence, the UT pig crashed into the pig receiver and sustained significant damage. The sealing pigs that were trailing behind the UT pig also collided with the rear of the UT pig, and it was at this junction that all further data transmission was ceased. A metal swarf was discovered upon inspection of the UT pig after retrieval, indicating that the inner wall of the pipeline also sustained damage. An analysis of the swarf indicated that it comprised solely of the CRA alloy that was metallurgically bonded to the inner wall of the carbon steel pipe. It was concluded that, due to the anticorrosive nature of the CRA material and high-quality control standards upheld during the manufacture of CRA pipes, the baseline in-line and routine inspections were unnecessary and can be detrimental if the inspection tool becomes impacted, thereby compromising the containment of the CRA layer.

Publisher

ASME International

Subject

Mechanical Engineering,Mechanics of Materials,Safety, Risk, Reliability and Quality

Reference27 articles.

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3