The complex and challenging project to move two sets of existing power lines from pylons into tunnels was fundamental to unlocking the Olympic Park site for the London 2012 Olympic and Paralympic Games. As the first major construction project for the games, the careful planning, collaborative working and innovation used by the project team set a benchmark for all subsequent contracts on the park. This paper describes the fundamentals of the project, which included ten shafts and 13 km of tunnels in difficult ground, as well as the challenges that were overcome and the key features of success.
Subject
Civil and Structural Engineering
Cited by
4 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Major sustainability drives on a large project, the Queen Elizabeth Park.;IABSE Reports;2015
2. Delivering London 2012: geotechnical enabling works;Proceedings of the Institution of Civil Engineers - Civil Engineering;2011-11
3. Introduction;Proceedings of the Institution of Civil Engineers - Civil Engineering;2011-11
4. Delivering London 2012: the Aquatics Centre;Proceedings of the Institution of Civil Engineers - Civil Engineering;2011-11