Affiliation:
1. Head of public affairs for the Channel Tunnel Rail Link project until mid-2002 and is now head of public affairs at Crossrail
Abstract
This paper describes the hybrid Bill process by which £5·2 billion Channel Tunnel Rail Link received its necessary enabling legislation in the form of an Act of Parliament. Even though the select committee became the longest-running ever to consider such a Bill, enactment took just two years. Petitioners achieved several minor changes to the project as well as 645 undertakings and assurances.
Subject
Civil and Structural Engineering
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. Channel Tunnel Rail Link section 1: Medway viaduct;Proceedings of the Institution of Civil Engineers - Civil Engineering;2003-11