1. Technical Director for Bridges, Asia, Jacobs, Kuala Lumpur, Malaysia (corresponding author: )
2. Technical Director, Arcadis, Guildford, UK
Abstract
This paper benchmarks the challenges involved with major sea, or fixed link, bridge crossings from their planning to final construction. An overview of existing major fixed link crossings globally, including statistical information such as length and inflation-adjusted project costs, is given. Data for well-known links such as the Øresund Crossing in Europe and the more recent Hong Kong–Zhuhai–Macau Bridge are included. The construction methods required to surmount the challenges of bridging such crossings and how advancements are making long-mooted crossings more feasible are discussed. Statistics on the construction durations of these crossings are presented and links between construction time, cost aspects and carbon dioxide emissions are considered. Finally, the paper looks to the future and considers how the data can be used to better bound estimates of time, costs, and emissions for fixed link projects. The viability of some of the more notable future fixed link projects is also addressed.
Subject
Building and Construction,Civil and Structural Engineering
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献
1. An update on bridge carbon dioxide footprint data;Proceedings of the Institution of Civil Engineers - Bridge Engineering;2024-03-26
2. Investigating climate change effects on bridges and tunnels;Proceedings of the Institution of Civil Engineers - Bridge Engineering;2024-02-23
3. A framework for decarbonisation for bridge owners, engineers and designers;Proceedings of the Institution of Civil Engineers - Bridge Engineering;2024-02-23
4. Carbon Emissions, Lifespan and Circularity Interaction Strategies;IABSE Reports;2024
5. Examples of carbon dioxide emissions data in the circular economy: highway transport;Proceedings of the Institution of Civil Engineers - Civil Engineering;2023-11-01