Performance of Foyle Bridge east abutment

Author:

Nicholson D. P.1

Affiliation:

1. Ove Arup & Partners

Abstract

The use of high quality granular embankment fill at Foyle Bridge enabled the east abutment to be founded directly on pad footings within the 13 m high approach embankment. This has allowed considerable savings to be made when compared with the piled foundation design proposed at tender. This foundation solution was possible because the free-draining sandy ground conditions ensured that embankment consolidation settlement was completed soon after the fill was placed. Also the bridge foundation differential settlement tolerances were relaxed to 40 mm and contingency plans were developed to shim the bridge-bearings to enable the designers to contend with the most unfavourable estimates of long-term settlement. The Paper describes the application of the observational method from the design stage, during which settlement predictions were made and contingency plans developed, to the post-construction stage, when settlement monitoring was carried out and contingency plans were reviewed. L'emploi d'un matériau de remblaiement granulaire de grande qualité a permis de fonder directement la culée du pont de Foyle sur des semelles installées dans le remblai de 13 m de haut. Ceci a permis de faire des économies importantes par rapport au projet initial de fondation sur pieux. Cette solution a pu être mise en oeuvre du fait du terrain sableux très drainant assurant au remblai un tassement de consolidation instantané. De plus, des tassements différentiels acceptables de plus de 40 mm sur les fondations du pont, combinés à un dispositif de relevage des éléments d'appuis ont permis aux concepteurs de faire face aux tassements résiduels probables les plus défavorables. L'article décrit les applications de la méthode d'observation depuis la conception durant laquelle les prévisions de tassements furent faîtes et les dispositifs d'adaptation éventuelle furent élaborés jusqu' à la construction lorsque les tassements ont été enregistrés et le dispositif de réglage revu.

Publisher

Thomas Telford Ltd.

Subject

Earth and Planetary Sciences (miscellaneous),Geotechnical Engineering and Engineering Geology

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Opening ceremony shaft for the Athens 2004 Olympic Games;Proceedings of the Institution of Civil Engineers - Geotechnical Engineering;2007-04

2. An overview of the observational method: development in cut and cover and bored tunnelling projects;Géotechnique;1994-12

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3