Affiliation:
1. School of Civil and Environmental Engineering, National University of Sciences and Technology, Islamabad, Pakistan (corresponding author: )
2. School of Civil and Environmental Engineering, National University of Sciences and Technology, Islamabad, Pakistan
Abstract
A database of 35 case histories of anchored pile walls, collected mainly from Chicago, Boston, Texas and Washington, DC, USA as well as Taiwan, has been evaluated to predict the performance of deep excavations in clays. Various factors (including excavation depth, undrained shear strength, wall bending stiffness, factor of safety and pile embedment) affecting the deformation characteristics of excavations supported by anchored pile walls are presented and compared with findings of previous researchers. The normalised maximum wall displacement δHmax/He falls in the range of 0·1–0·7% and the location of δHmax is at a depth of 0·4He to 1·0He. Normalised maximum ground surface settlement δVmax/He is in a range of 0·1–0·4%. The ratio of maximum surface settlement to maximum lateral displacement falls in the range of 0·7–1·4, with an average value of 1·0. Maximum wall displacements are dependent on undrained shear strength and factor of safety and decrease with an increase in these factors. Maximum wall displacements decrease by increasing wall stiffness and most of the cases are bounded by values of EI/He between 35 MNm and 120 MNm. The effect of system stiffness is more pronounced in soft clays whereas deformations in stiff clays are less dependent on system stiffness.
Subject
Earth and Planetary Sciences (miscellaneous),Geotechnical Engineering and Engineering Geology
Reference30 articles.
1. Method for Estimating System Stiffness for Excavation Support Walls
2. Carder DR (1995) Ground Movements Caused by Different Embedded Retaining Wall Construction Techniques. Transport Res. Berkshire, UK, Lab. Rep. 172.
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献