Exploring a Quantitative and Qualitative Mixed Approach for Estimating Preliminary Engineering Efforts of Bridge Replacement Projects

Author:

Araya Felipe1,Faust Kasey1,Khwaja Nabeel2,O’Brien William J.1,Liang Xiaopeng3,Bur Mohamed K.4

Affiliation:

1. Department of Civil, Architectural, and Environmental Engineering, The University of Texas at Austin, Austin, TX

2. Center for Transportation Research, The University of Texas at Austin, Austin, TX

3. Fulton Construction Corporation, Christi, TX

4. Texas Department of Transportation, Mesquite, TX

Abstract

While managing the transportation infrastructure, state transportation agencies (STAs) face multiple challenges. Primary among these are budgetary constraints and understaffing. One task that is impacted by these challenges is that of developing the plans, specifications, and estimates (PS&E) for construction projects. STAs often outsource this job to consultants. The outsourcing itself requires a contract negotiation process, which has historically relied on the work experience of the negotiation parties. PS&E budget development and management relies on an estimate of the engineering man-hours (EMHs). This paper presents a mixed approach to creating that estimate. To identify engineering-related tasks as variables in the estimation of EMHs for the development of PS&E, this approach uses qualitative analysis. The variables identified through qualitative analysis are used to build multiple linear regression models. Data used for this study include project characteristics from the Texas Department of Transportation (TxDOT) and the respective work authorizations from 38 bridge replacement (BR) projects. The results revealed that variables identified through the qualitative analysis are statistically significant to estimate the EMHs of BR projects. However, the improvement in such estimation was found to be marginal. By developing a data-driven approach, this study provides an improved process for estimating EMHs for BR projects—an improvement over the commonly used experience-based approach. This incremental step contributes a method STA staff can use to make better-informed decisions during the contract negotiation process undertaken while outsourcing preliminary engineering (PE) work.

Publisher

SAGE Publications

Subject

Mechanical Engineering,Civil and Structural Engineering

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3