Does Periodic Maintenance Cause Unscheduled Outages?

Author:

Berkeley Emily1,Rakas Jasenka2,Handal Jady3

Affiliation:

1. Department of Civil and Environmental Engineering, Room 107A, University of California, McLaughlin Hall, Berkeley, CA 94720.

2. Room 107D, National Center of Excellence for Aviation Operations Research, Institute for Transportation Studies, University of California, McLaughlin Hall, Berkeley, CA 94720.

3. National Airspace System Operations, NAS Performance and Quality Assurance Division, Federal Aviation Administration, AOP-200, Room 734, 800 Independence Avenue, SW, Washington, DC 20591.

Abstract

It has been suspected for some time that unscheduled outages of National Airspace System equipment increase during core working hours; to date, however, no research has been done to determine their cause. First, aggregate trends in scheduled periodic maintenance (PM) activities and unscheduled outages are examined for calendar years 2000 through 2004. The reported increase in unscheduled outages is postulated to be due to increased levels of maintenance activities that may occur during this period. A detailed analysis is presented, and the individual pieces of equipment that suffer unscheduled outages after receiving PM are examined. If PM activities have an effect on unscheduled outages, then higher levels of unscheduled outages would be expected to occur in the first hours after the completion of a PM task. Further data analysis shows evidence for this hypothesis.

Publisher

SAGE Publications

Subject

Mechanical Engineering,Civil and Structural Engineering

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3