Affiliation:
1. The State Key Laboratory of Fluid Power and Mechatronic System, Zhejiang University, Hangzhou, China
Abstract
Disassembly is a necessary link to realize the integrity of product life cycle. Asynchronous Parallel Disassembly (APD) is an important way to achieve efficient disassembly. Due to the asynchronous start of disassembly tasks by operators in APD, the calculation complexity of disassembly sequence planning optimization increases more obviously with the increase of product complexity. Further, the disassembly sequence is a discrete numerical value, which is difficult to be efficiently realized by existing optimization algorithms. To overcome these difficulties, we introduced a complex products APD description. It helped to describe the APD problem with multiple disassembly resources. Based on the APD resources overall matrix, a three-objective, viz., the total disassembly time-consuming, the disassembly direction change times, and the disassembly tools replacement times, optimization model was constructed. To obtain the optimal disassembly planning sequence, the improved discrete NSGA-II (IDNSGA-II) was proposed, which introduced a novel population restart mechanism. The proposed method was verified in a bevel gearbox disassembly process from the EAS4633 rescue inspection equipment. The optimal results showed the APD sequence planning multi-objective optimized results obtained by the IDNSGA-II algorithm can be close to the single object optimized results. For the rest objects, the optimal solution obtained from the multi-objective genetic algorithm is obviously better.
Subject
Industrial and Manufacturing Engineering,Mechanical Engineering
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献