Affiliation:
1. State Grid Shandong Electric Power Research Institute, Jinan 250003, China
2. Shandong Smart Grid Technology Innovation Center, Jinan 250003, China
3. College of Electrical Engineering and New Energy, China Three Gorges University, Yichang 443002, China
Abstract
In a hydropower station, equipment needs maintenance to ensure safe, stable, and efficient operation. And the essence of equipment maintenance is a disassembly sequence planning problem. However, the complexity arises from the vast number of components in a hydropower station, leading to a significant proliferation of potential combinations, which poses considerable challenges when devising optimal solutions for the maintenance process. Consequently, to improve maintenance efficiency and decrease maintenance time, a discrete whale optimization algorithm (DWOA) is proposed in this paper to achieve excellent parallel disassembly sequence planning (PDSP). To begin, composite nodes are added into the constraint relationship graph based on the characteristics of hydropower equipment, and disassembly time is chosen as the optimization objective. Subsequently, the DWOA is proposed to solve the PDSP problem by integrating the precedence preservative crossover mechanism, heuristic mutation mechanism, and repetitive pairwise exchange operator. Meanwhile, the hierarchical combination method is used to swiftly generate the initial population. To verify the viability of the proposed algorithm, a classic genetic algorithm (GA), simplified teaching–learning-based optimization (STLBO), and self-adaptive simplified swarm optimization (SSO) were employed for comparison in three maintenance projects. The experimental results and comparative analysis revealed that the proposed PDSP with DWOA achieved a reduced disassembly time of only 19.96 min in Experiment 3. Additionally, the values for standard deviation, average disassembly time, and the rate of minimum disassembly time were 0.3282, 20.31, and 71%, respectively, demonstrating its superior performance compared to the other algorithms. Furthermore, the method proposed in this paper addresses the inefficiencies in dismantling processes in hydropower stations and enhances visual representation for maintenance training by integrating Unity3D with intelligent algorithms.
Funder
State Grid Shandong Electric Power Research Institute Independent Research Project "Research on Remote State Assessment and Support Power Grid Capability of Pumped Storage Power Station"
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献