An Empirical Analysis of the Influence of Project Governance and Information Technology Governance on Project Delay

Author:

Khalid Mahwish1,Khan Rao Aamir1,Khushnood Muhammad2ORCID,Aslam Sohail3,Khattak Zeeshan Zaib2,Abbas Sammar2ORCID

Affiliation:

1. Department of Management Sciences, Comsats University, Islamabad, Pakistan

2. Institute of Business Studies, Kohat University of Science and Technology, Kohat, Khyber Pakhtunkhwa, Pakistan

3. Department of Project and Operation Management, The Islamia University, Bahawalpur, Pakistan

Abstract

Project delay adversely affects the cost overrun, poor quality and stakeholder’s disputes thus resulting in unsuccessful projects. Project delay has a number of antecedents including the governance of project and information technology. The study provides empirical analysis of determinants of schedule delays in project completion. This will test the hypothesis that assumes that project governance and information technology governance are major predictor of project schedule delays. The study considers the software industry located in twin cities of Islamabad and Rawalpindi, Pakistan. According to the Pakistan Security and Exchange Commission, there are 245 software houses registered in Islamabad while 80 are registered in Rawalpindi. The study has used survey questionnaires to gather required information. Data was collected through simple random sampling techniques from 220 respondents. The data collected was analysed by doing structural equation modelling (SEM) to examine the said relationships. The reliability and validity of the instrument is established by the Cronbach’s α, composite reliability, and average variance extracted having values above threshold of 0.7, 0.7, and 0.5, respectively. The regression weight for first hypothesis (H1) assuming negative relationship between ITG and PD is −0.292. The second hypothesis (H2) assuming negative relationship between PG and PD has regression value of −0.418. The values of both hypotheses are significant. The study empirically tests the relationship between ITG, PG, and PD. The results suggest that better project governance (PG) reduces project delay (PD) and vice versa. Similarly, an appropriate information technology governance (ITG) also reduces the project delay (PD).

Publisher

SAGE Publications

Subject

Business and International Management

Reference104 articles.

1. Exploring the importance and implementation of COBIT processes in Saudi organizations

2. The professionals’ perspective on the causes of project delay in the construction industry

3. Ahdadou M., Aajly A. & Tahrouch M. (2022). Information technology governance: Lessons learned from the Covid-19 crisis. International Journal of Business and Technology Management, 4(1), 2682–7646. https://hal.archives-ouvertes.fr/hal-03599334/document

4. Information technology investment governance: What is it and does it matter?

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3