This study presents an overview of estimation methods to predict the actual project duration of Greek highway projects. Emphasis is given to the selection of the appropriate parameters that correlate with the actual project duration and to compare the performances of the main two methods, the linear regression (LR) with the neural network models (NN) based on data available at the bidding stage. In the context of the current research, thirty-seven highway projects were examined, constructed in Greece with similar available data like the extent, the type of work packages and the significance. Selection and ranking variables through correlation analyses using SPSS 25 has been carried on, in order to identify the most significant project variables. These include archeological findings, type of terrain, land expropriation, the existence of bridge, tunnel and embankment. Next step was the use of WEKA application, that highlighted the most efficient subset of variables. After the definition and grouping of the variables for actual duration prediction, these were used as input data for linear regression models (LR) and neural network models (NN). Various models have been created from each investigated method. While their performance and the comparison of linear regression and neural network models to estimate the actual duration of Greek highway projects are presented in this paper. Results’ discussion and conclusions along with limitations and further research are appropriately analyzed.
Publisher
World Scientific and Engineering Academy and Society (WSEAS)
Subject
Economics and Econometrics,Finance,Business and International Management
Reference22 articles.
1. Antoniou F., Aretoulis G.N., Konstantinidis D. and Papathanasiou J., Choosing the Most Appropriate Contract Type for Compensating Major Highway Project Contractors, Journal of Computational Optimization in Economics and Finance (JCOEF), Vol. 6, No. 2, 2014, pp. 77- 95.
2. Aretoulis G. N., Angelides D. C., Kalfakakou G. P., Fotiadis G. S. and Anastasiadis K. I., A prototype system for the prediction of final cost in construction projects. International Journal of Operational Research, Special Issue, Vol. 6, No. 3, 2006, pp. 423–432.
3. Shah, R.K. and Dawood, N., An innovative approach for generation of a time location plan in road construction projects. Construction Management and Economics, Vol. 29 No. 5, 2011, pp. 435-448.
4. Aretoulis, G.N., Kalfakakou, G.P. and Striagka, F.Z., Construction material supplier selection under multiple criteria, Operational Research, Vol. 10 No. 2, 2010, pp. 209-230.
5. Antoniou F., Delay Risk Assessment Models for Road Projects, Systems, Vol.9, No.3, 2021, pp.70.
Cited by
2 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献