Author:
Young Damali,Panthi Kamalesh,Noor Omar
Abstract
McKinsey Global Institute (2017) in its report states that construction-related spending accounts for 13% of the world’s GDP, but the sector’s annual productivity has only increased 1% over the past 20 years. As with all other industries, as years pass innovation is intended to increase and introduce much higher productivity levels and safer work environments. It has been more than a decade of BIM utilization in construction jobsites. The introduction of three-dimensional modeling was supposed to serve as the turning point regarding technology in construction, but have we truly seen the effective utilization of BIM in construction process? So, what are the roadblocks to a smoother transition from paper-based 2-D to electronic 3-D Models in construction job sites? Utilizing both a questionnaire survey and an in-depth interview technique, this study explored the reasons behind the slow adoption and apprehensions in adopting 3-D Models in construction projects. Ineffective and lack of training in BIM was found to be one of the reasons for less than slower adoption of the BIM in construction job sites.
Cited by
14 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献