Air Traffic Control Capacity Planning Under Demand and Capacity Provision Uncertainty

Author:

Starita Stefano1ORCID,Strauss Arne K.2ORCID,Fei Xin3,Jovanović Radosav4,Ivanov Nikola4,Pavlović Goran4,Fichert Frank5

Affiliation:

1. Sasin School of Management, Chulalongkorn University, Bangkok 10330, Thailand;

2. WHU–Otto Beisheim School of Management, 56179 Vallendar, Germany;

3. Warwick Business School, University of Warwick, Coventry CV4 7AL, United Kingdom;

4. Faculty of Transport and Traffic Engineering, University of Belgrade, 11000 Belgrade, Serbia;

5. Faculty of Tourism and Transport, Worms University of Applied Sciences, 67549 Worms, Germany

Abstract

In air traffic management, a fundamental decision with large cost implications is the planning of future capacity provision. Here, capacity refers to the available man-hours of air traffic controllers to monitor traffic. Airspace can be partitioned in various ways into a collection of sectors, and each sector has a fixed maximum number of flights that may enter within a given time period. Each sector also requires a fixed number of man-hours to be operated; we refer to them as sector-hours. Capacity planning usually takes place a long time ahead of the day of operation to ensure that sufficiently many air traffic controllers are available to manage the flow of aircrafts. However, at the time of planning, there is considerable uncertainty regarding the number and spatiotemporal distribution of nonscheduled flights and capacity provision, the former mainly due to business aviation, and the latter usually stemming from the impact of weather, military use of airspaces, etc. Once the capacity decision has been made (in terms of committing to a budget of sector-hours per airspace to represent long-term staff scheduling), on the day of operation, we can influence traffic by enforcing rerouting and tactical delays. Furthermore, we can modify which sectors to open at a given time (the so-called sector-opening scheme) subject to the fixed capacity budgets in each airspace. The fundamental trade-off is between reducing the capacity provision cost at the expense of potentially increasing displacement cost arising from rerouting or delays. To tackle this, we propose a scalable decomposition approach that exploits the structure of the problem and can take traffic and capacity provision uncertainty into account by working with a large number of traffic scenarios. We propose several decision policies based on the resulting pool of solutions and test them numerically using real-world data.

Publisher

Institute for Operations Research and the Management Sciences (INFORMS)

Subject

Transportation,Civil and Structural Engineering

Reference16 articles.

1. Baumgartner M (2007) The organisation and operation of European airspace. Cook A, ed. European Air Traffic Management: Principles, Practice and Research (Ashgate Publishing Limited, Farnham, UK), 1–34.

2. The Air Traffic Flow Management Problem with Enroute Capacities

3. The design of a market mechanism to allocate Air Traffic Flow Management slots

4. Conniss R, Curtois T, Petrovic S, Burke E (2014) Scheduling air traffic controllers. 10th Internat. Conf. Practice Theory Automated Timetabling, August 26-29, York, UK.

5. Cook A, Tanner G (2015) European airline delay cost reference values. Technical report, University of Westminster, London.

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3