Creative Engineering Solutions Accelerating Delivery Across Onshore Horizontal Oil Producers Wells by 20% in the Middle East

Author:

Almuallim Mustafa1,Silva Paul1,Al Shaikh Jaffar1

Affiliation:

1. Schlumberger

Abstract

Abstract A study of detailed engineering solutions development and the analysis are described in this paper to optimize drilling and flat time operations across onshore Horizontal Oil Producers in the Middle East. This approach discusses detailed engineering analysis conducted to enhance rate of penetration (ROP) and flat time operation. ROP of each section was increased by optimizing bit selection based on bit records and lithology analysis. Then, a road map was constructed based on dynamic analysis involving shocks and vibration, stick and slip and actual mechanical specific energy output at the bit. Flat time was minimized thru the implementation of creative initiatives including setting casing on bottom to decrease WOC time. Additionally, BHA components across vertical sections were standardized to minimize handling time. Finally, excessive time to picking up and lay down additional 5-in. pipes historically used to drill curved section and run liner was eliminated thru utilization of 4-in. DP across curved and lateral sections. During the drilling campaign of over 30 wells, all engineering solutions described in this paper were successfully implemented and resulted in 20% optimization of overall well delivery time across onshore Horizontal Oil Producers in the Middle East. Conductor casing was set on bottom eliminating time to wait on cement (WOC), BHA configurations of drill collars, HWDPs, reamers and jar where standardized resulting in 25% optimization in flat time associated with BHA and pips handling at top vertical sections. Additionally, 5-in. pipes were eliminated through proper utilization of 5-in. HWDP to drill top holes and 4-in. pipe to drill curved and horizontal sections saving over 2 days of well time. Drilling performance was improved by over 20% after the implementation and follow up on road maps. This study provides practical and creative solutions that can be easily replicated elsewhere to optimize well construction time. Also, this paper discusses novel solutions associated with buckling and TnD analysis for casing on bottom and drilling curved sections with 4-in DP.

Publisher

IPTC

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3