Production Tubing Integrity Evaluation for Complex Workover Well Operations in Niger Delta

Author:

Anyanwu Chinedu1,Agbo Ejimofor1,Olusola Bukola1

Affiliation:

1. Newcross Exploration and Production Limited

Abstract

Abstract To successfully carry out a workover on a well that was completed more than 20 years ago as a dual string completion with a dual packer and two Permanent Packers is complicated. The presence of a slickline fish of unknown dimensions in hole further complicated the nature of the workover thus making it susceptible to failure during the retrieval of the tubings. A Tubing Integrity Evaluation Methodology (TIEM) was used to properly assess potential failure points and craft out execution strategy to mitigate them. The TIEM adopted in this paper involved carrying out a detailed tubing stress analysis on the completion tubings where axial loads exerted on the tubing; weight, buoyancy, point loads on crossovers, piston loads, ballooning; as well as triaxial stress effect of axial, radial and tangential stresses were all estimated. The yield strength and yield stress completion tubing were de-rated by 30 percent as a precautionary measure due to the age of the completion tubings. The maximum overpulls the tubings could sustain without failing by parting, axially or yielding triaxially were calculated. These overpull forces was compared with the force required to unseat the dual packer as well as snap out from seal assemblies of the permanent packers to decide whether the tubing was to be cut prior to pulling or not during the tubing retrieval operation. Several fishing scenarios of slickline and drill pipe fishing were analysed based on the location of the slickline fish. Based on the results of the detailed tubing stress analysis, the maximum overpull the short string and long string sections could sustain were 58,000 lbs and 23,000 lbs respectively while the maximum force required to unseat the dual packer was 50,000 lbs. Thus, it was decided to pull the short string within the overpull limit while the long string was to be cut above the packer prior to unseating the packer. The Tubing evaluation helped to properly assess potential failure points and craft out execution strategy to mitigate or avoid potential problems associated with the workover operations with unknown dimensions of fish in the wellbore.

Publisher

SPE

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3