Affiliation:
1. Department of Naval Architecture and Ocean Engineering, Seoul National University, Seoul 08826, Korea
2. Research Institute of Marine Systems Engineering, Seoul National University, Seoul 08826, Korea
Abstract
ABSTRACT
During the shipbuilding process, a block assembly line suffers a bottleneck when the largest amount of material is processed. Therefore, scheduling optimization is important for the productivity. Currently, sequence of inbound products is controlled by determining the input sequence using a heuristic or metaheuristic approach. However, the metaheuristic algorithm has limitations in that the computation time increases exponentially as the number of input objects increases, and separate optimization calculations are required for every problem. Also, the heuristic such as dispatching algorithm has the limitation of the exploring the problem domain. Therefore, this study tries a reinforcement learning algorithm based on a pointer network to overcome these limitations. Reinforcement learning with pointer network is found to be suitable for permutation flowshop problem, including input-order optimization. A trained neural network is applied without re-learning, even if the number of inputs is changed. The trained model shows the meaningful results compared with the heuristic and metaheuristic algorithms in makespan and computation time. The trained model outperforms the heuristic and metaheuristic algorithms within a limited range of permutation flowshop problem.
Funder
Ministry of Trade, Industry and Energy
Publisher
Oxford University Press (OUP)
Subject
Computational Mathematics,Computer Graphics and Computer-Aided Design,Human-Computer Interaction,Engineering (miscellaneous),Modeling and Simulation,Computational Mechanics
Cited by
13 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献