Risk management at the stages of the life cycle of NPP projects

Author:

Ashraideh Mohammad,Engovatov Igor

Abstract

The article discusses the issues of risk management at all stages of the life cycle of nuclear power plants. The definition and classification by types of risks that arise during the stages of the life cycle and operation of difficult objects such as nuclear power plants. Risk is anything that has the potential to affect each stage of a facility’s life cycle, performance, longevity, safety, or project budget. Thus, risk management is the process of identifying, classifying, prioritizing and planning risks. This article not only discusses the identification and classification by types of risks that arise during the construction and operation of such complex facilities as nuclear power plants, but also describes the methods for assessing and managing risks, taking into account the specifics of the construction of nuclear power facilities. There are two methods of risk assessment: quantitative and qualitative. The article describes such Quantitative methods as “Scenario Technology”, “Method - Sensitivity Analysis”, “Diagramming Technique - Tree Analysis”, as well as such Qualitative risk assessment methods as “Assessment of the probability of risk and its impact”, “Evaluation Matrix probability/risk of impact”, “Probability and impact”, “Risk classification and assessment of risk urgency. As a result of the analysis of existing risk management methods at all stages of the life cycle, the following conclusions were drawn: Risk identification can occur at any stage of the life cycle of a nuclear power plant, even after completion of construction work and delivery of the project. The maximum number of risks for all stages of the NPP life cycle should be identified at the stage of Sitting and design. The article proposes the format of the risk register table, provides a risk classification scheme, and develops a risk management flow chart at the stages of the NPP life cycle.

Publisher

EDP Sciences

Subject

General Medicine

Reference19 articles.

1. Shkurko V.E., Project Risk Management (LLC “Publishing house Jurait”, Moscow, 2014)

2. Professor Perry J., Simon P., Project Risk Analysis and Management Guide (APM, London, 1997)

3. Heum J., Yeon Risk framework for the next generation nuclear power plant construction: PhD Civil Engineering Sciences (Texas, 2012)

4. Guide to the project Management Body of Knowledge (PMBOK Guide) (Project Management institute, USA, 2008)

5. Project Risk Analysis and Management Guide (Princes Risborough: Association for project Monument, 2018)

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3